Ithaca Builds

Mapping, photos and information for Ithaca construction and development projects

All Suites Hotel Proposal on Route 13

November 17, 2013 // by Jason Henderson

The site plans and elevations for this proposed “All Suites Hotel” project by Ithaca Hotels, LLC have been disclosed and are embedded below. Here’s the previous post noting that the plan includes:

“A 4-story, 11,769-SF hotel with approximately 76 rooms and 76 parking spaces. The 1.4‐acre project site contains two contiguous tax parcels, containing a 7,500+/‐ SF office commercial building, fronting Elmira Road, and an auto‐body shop in the rear ― with access from Spencer Road and large paved parking areas.”

I’m not certain that this is an actual franchise, but the elevations look typical of one, and may perhaps be a Holiday Inn Express or similar brand from InterContinental Hotels Group. The plans were done by Silvestri Architects out of Amherst, NY. Silvestri has some current projects going up, mostly in Buffalo- most recently, St. Martin Village apartment complex in Buffalo, which included the remodel of a former German Catholic Orphanage building. As far as hotels go, they’ve previously done a Best Western, a Fairfield Inn, and are working in a Holiday Inn Express in Pennsylvania.

 

 

 

 

Purity Ice Cream Updated Site Plan Documents

November 6, 2013 // by Jason Henderson

Still bummed that the tower is a no-go, but the new scaled-down design for an expanded Purity Ice Cream store space and new second-story office by John Snyder Architects looks spiffy. As was announced back in October, the new plan calls for an expansion of Purity Ice Cream’s store operations, and a buildout of the second story and roof level above to include 2,640 square feet of office space and a terrace area, slated to start January next year. The PDF below contains a further revised design, full site and landscaping plans, as well as a code review on the first page. The facade improvements call for new sections of accent brick and aluminum curtain walls.

Purity-Shot-GE

Purity-November-Grab-Site-Plan

Purity-November-Grab-Site-Plan2

Cherry Street Crossfit Gym Proposal

October 24, 2013 // by Jason Henderson

There’s a proposal for a 10,368 Gross square foot steel-sided building on Cherry Street for a Crossfit Gym, by the company Mad4Cherry, LLC. The floor plan shows a 6,000 SF open gym area, a 1,900 SF separate gym, a couple offices, two locker rooms, and a utility room. Site plans and a map are embedded below. The site is situated between e2e Materials and Evaporated Metal Films Corp. The parcel shows up on the Ithaca Urban Renewal Agency’s (IURA) 2011 real property inventory as a 1.02 acre site for light manufacturing assessed at $180,000 with a lessee “J. Moro”.

 

Assessment-photo-96-2-1-22

 

Rick’s Rental World Expansion Plans

October 23, 2013 // by Jason Henderson

A regular go-to shop for contractors and weekend warriors alike in Ithaca, Rick’s Rental World has intentions to expand on their parcel at 800 Cascadilla Street (all the way at the west end of Cascadilla). Plans had already been established last year for the 2,300 square foot metal building addition at the south end, and here’s a newer proposal including a 30′ x 39′ pole barn at the north end. The site plan and project narrative are embedded below. The two additions will help the operation consolidate rental equipment into enclosed areas for storage and maintenance.

 

Ricks_Rental_10173

 

 

 

South Hill Digicomp ATM Drive-Thru & Restaurant Space Proposal

October 22, 2013 // by Jason Henderson

Here’s a proposal from ICS Development Partners & Architect Jagat P. Sharma to build out the current Digicomp building on South Hill Route 96B into a drive-thru ATM and restaurant space, keeping the current Digicomp space in the basement. I’m not familiar with ICS Development Partners, but the entity filing is in Tompkins County and dates back to 1994 on this address (930 Danby Rd) listing the same chief executive officer as Digicomp, so it’s clearly the same owner. The Town Planning Board presentation was given back on the 15th for consideration, and the proposed use variances were granted by the Board of Zoning Appeals back in July.

South-Hill-Plaza

 

 

Purity Ice Cream Project Scales Down- No Apartment Tower

October 14, 2013 // by Jason Henderson

Bummer news here, but I imagine there are some strong reasons: The Purity Project has scaled down, and will no longer be seeking to build an apartment tower on the site. The revised project narrative (page 2 below) cites market conditions as the cause. The new plan is for an expansion of Purity Ice Cream’s store operations, and a buildout of the second story and roof level above to include 2,640 square feet of office space and a terrace area. The project is looking to start January 2014 with a construction schedule of 10-12 months. Here’s the first paragraph of the architectural narrative, providing a good summary of the revised project:

Purity_Arch_Narrative_Oct_13

 

New Site Plans and Parking Evaluation embedded below:

 

 

RFEI Documents for the IURA’s Cherry Street Parcel

October 9, 2013 // by Jason Henderson

Here are the RFEI (Request for Expression of Interest) documents for the IURA’s (Ithaca Urban Renewal Agency) Cherry Street Parcel, first announced back in June. The IURA’s homepage has links to the full application, engineering reports, and support documents- the deadline was last September, the 27th, so there may be applications in the review process at the moment.
Embedded below is the RFEI report, a GIS map, and a survey showing the 2.25 acre subdivision of the original 8 acre parcel the City plans to retain (it’s a section of wetland). The RFEI report explains the IURA’s objective, the site description, the selection process, zoning specifics, and the desired format of respondents. Hopefully we’ll hear soon whether or not there is a potential project here- I haven’t seen anything in the meeting minutes yet.

 

 

 

CAYUGA WATERFRONT TRAIL PHASE 2 PLANS

October 7, 2013 // by Jason Henderson

Soo… at long last, like many other folks that use the current trails, I was overjoyed to see these plans pop-up for City Planning Board consideration. These Phase Two plans are for the anticipated connection between the Stewart Park/Golf Course waterfront trail section and the Cass Park trail section, including bridges spanning the two waterways between the Cayuga inlet island. The plans show a proposed path from the Park Road trail section, then over the inlet following the Cliff Street and Buffalo Street bridges, and up along the inlet waterfront to just past 3rd Street, where the current trail meets and wraps around the Ithaca Farmer’s Market.

The Cayuga Waterfront Trail Initiative just launched a new website, which will likely provide further information on the proposed connection.

The design work was completed by Bergman Associates, and the new pedestrian/bike bridges will be accepting bids for design, fabricate and build pricing from the bridge contractors listed on the bridge scope document below.

Harold’s Square Proposing Trash & Recycling Area Relocation

October 4, 2013 // by Jason Henderson

Sort of a minor item here, but just imagine you’ve rented a brand new apartment or office space on the Commons with a fantastic southern view, but as soon as you open the window, it smells like trash. As explained in the project description below, it looks as if there’s been an agreement made to prevent this scenario.
Currently, there’s a large City trash compactor and recycling dumpster sitting in a recently gated block-enclosure on the northern ground level of the Green Street Parking Garage, and the proposal below intends to move the operation to the Center Ithaca alley service area, and reconfigure the space won for eight additional parking spaces. Site plans and renders from STREAM Collaborative below:

 

 

 

 

Harold’s Square Final Drawings

September 3, 2013 // by Jason Henderson

Along with 130 E Clinton St and Cayuga Green II, Harold’s Square was approved at last Tuesday’s Planning Board meeting, and here is the final set of site plans. The final build is as follows:
140‐foot tall
11‐story
132,000 Gross SF
11,000 SF of ground‐floor retail
41,200 SF upper‐story office (three stories)
Six stories of residential (up to 36 units)

As described in the Planning agenda, the project as proposed may require a State Building Code Variance, a Type I Action under both the City and State Environmental Quality Review Ordinance/Act: rules found here. The referenced actions are for construction [on] a historic structure (1)(h)[4], a development with more than 15 dwelling units (1)[k], and a development with more than 50,000 Gross SF (1)[n]. The referenced State rule (SEQR Act 617.4 (b)(9)) is for historic considerations as well.

Harold's_Square_Perspective

Harold's_Square_Diagram

Harold's_Square_Perspective2