Scenes from the Commons Rebuild Project

November 4, 2014 // by Jason Henderson

Bank Alley continues to take shape as Raulli & Sons secured the Bernie Milton Pavilion roof assembly on the structure last week. Syrstone continues to spread stone base and install pavers along Bank alley, and future planters and benches are taking form along the eastern extension to Aurora Street. Power & Construction has already completed wiring and round footings for the pole lamps, which will permanently replace the temporary lighting as the surfaces phase progresses.

Photos taken October 30th:
Commons_Rebuild_10301412

Commons_Rebuild_10301418

New sidewalk bump-out around Starbucks and Kilpatricks:
Commons_Rebuild_10301407

Photos taken November 3rd:
The New Bernie Milton Pavilion:
Commons-Rebuild-Ithaca-11031402

Commons-Rebuild-Ithaca-11031405

Commons-Rebuild-Ithaca-11031408

Commons-Rebuild-Ithaca-11031410

Home Dairy Alley gets new concrete:
Commons_Rebuild_10301401

Commons-Rebuild-Ithaca-11031411

Commons Rebuild Project Starts Laying Pavers

October 26, 2014 // by Jason Henderson

The Ithaca Commons Rebuild Project crews have begun laying pavers over top of stone bases along Bank Alley, and several sections of concrete have been poured along Bank Alley and the east end for the floor and planter boxes, along with tube pours for the pole lighting systems. Steel sections of the new Bernie Milton Pavillion arrived in mid-October, and crews have been welding together the frame for the roof at the end of Bank Alley. The Home Dairy Alley also received a new concrete walkway. Previous design posts here (part one link) and here (part two link).

Photo from September 17th:
Commons-Rebuild-Ithaca-0917142

Photos from October 24th:
CommonsRebuild-10241412

CommonsRebuild-10241411

CommonsRebuild-10241410

CommonsRebuild-10241406

CommonsRebuild-10241407

Commons render sasaki

Commons Rebuild: Telecom Vaults & Gas Line

April 1, 2014 // by Jason Henderson

The-Commons_Ithaca_0320142

 

The Commons Rebuild project entered Phase Three this past month, as Vacri Construction is back on site digging-out trenches for the installation of telecom pipe ducts and utility vaults (the large pre-formed concrete blocks with manhole access).  The duct bank run along the western end near Cayuga Street is being worked on right now.

In addition to the duct piping and vaults, NYSEG is installing a new gas main along several of the outside edges of the construction fence to replace the old one. The concrete slab is cut and removed in sections, then several feet of soil is dug out to install the piping. The gas main is not part of Vacri’s contract, but since the gas main is quite old, NYSEG requested to replace it during the same timeframe since the project presents an ideal opportunity to do so.  As of now, the concrete is cut, but not yet removed.

 

The_Commons_Rebuild_0328141

The_Commons_Rebuild_0328145

The_Commons_Rebuild_0401142

Commons Rebuild Phase Three Begins this Week

March 11, 2014 // by Jason Henderson

Commons_Rebuild_0211141

As was announced in the Ithaca Times, the Commons Rebuild Phase Three is a go, with work starting this week. Phase Three of the Commons Rebuild will focus on the demolition of the remaining concrete surfaces, installation of new pavers, and installation of surface amenities (see earlier posts for more detail: Part One, and Part Two here). The Power & Construction Group (out of Scottsville, NY) was awarded the electrical work contract, and will begin work by transitioning to a temporary lighting system, as the current pole lights are removed to prepare the edge strips in front of businesses for demolition. NYSEG will be on site to finish-up a new gas main, and Vacri Construction (out of Binghamton, NY) is back for phase three as the only bidder and recipient of the general contract. The general bid came in at $2 million over-budget, which includes the reductions in three project scope addendums. Some original design items have been removed from the project:

Items that have been removed:
-Entrance Gateways
-Granite Pavers for fill sections
-Water Feature
-Playground

Items still included:
-Bernie Milton Pavilion
-Benches, Planters, Tables & Chairs, Bike Racks, & various standard surface amenities

Common Council approved a resolution at their meeting on February 19th to fund the amount, and the Board of Public Works accepted the contract at their meeting on February 24th.

Addendum Two Material & Finish Changes:
MP101-MP102-Commons-Surfaces

Final Concrete Paver Layout:
MP105-MP105-Commons-Concrete-Pavers