Ithaca Builds

Mapping, photos and information for Ithaca construction and development projects

Cayuga Place Residences Begins Sitework

April 29, 2014 // by Jason Henderson

It looks like the deal for this site has closed, and Bloomfield/Schon + Partner‘s Cayuga Place Residences (Cayuga Green Two) is off to an immediate start, beginning sitework this week. A bulldozer and two excavators are on site, and a construction fence has been put up around the future 45-unit market rate apartment building (latest plans from August here) that will reach seven stories high, with a gross floor space of over 50,000 square feet on a 6,920 square foot base.

Cayuga_Place_Residences_0429142

Cayuga_Place_2_Shot

Cayuga_Place_Residences_0429141

Goldwin Smith / Future Klarman Hall February Site Photos

February 24, 2014 // by Jason Henderson

A few more windows on the east side of Goldwin Smith Hall have been boarded-up, and roofing work as part of the enabling work scope for the Klarman Hall project has been proceeding (LeChase Construction), as the entire existing slate and metal roofing materials are replaced with new metal, flashing, and slate pieces. If I’m not mistaken, I believe by this point, the entire north wing, the northern-central section, and the southern and northern slopes of the south wing have new slate installed. The Cornell Chronicle posted an article about how the temperatures have been affecting the project.

The target completion for Klarman Hall is late 2015, with 33,250 square feet of new space going for LEED Platinum certification, a 350 seat auditorium, and a large inner-atrium space, opening-up the Goldwin Smith rotunda for cafe-service areas and entry/egress into Goldwin Smith. Embedded images for each of the four floor plan levels are here in the previous post. Welliver is the general contractor on this project.

Klarman_Goldwin_Cornell_Ithaca_02231406

Goldwin-Smith-Roof-Demo

Klarman_Goldwin_Cornell_Ithaca_02231410

klarman-atrium

Klarman_Goldwin_Cornell_Ithaca_02231402