Klarman Hall Structural Steel Complete

April 7, 2015 // by Jason Henderson

Hats off to Welliver and the crew from Raulli & Sons Ironworks sticking it out through the winter to get the structural steel done. Steel crane is now off site, and as the project rolls on, the new folding jib telescopic tower crane is up-and-running for the remainder of the work, especially the Josef Gartner glass installers that will be working on the glazed ceiling and wall systems that compose the atrium structure.

Throughout the structural phase, many of the exterior wall frames have now been assembled and sheathed with glass-mat sheathing in preparation for sandstone panels and various cladding types, and trades for electrical, plumbing, sprinkler systems, etc. have been busy. Interior framing started on the North side in March, and drywall and paint will be taking up much of May and June.

Photos from April 6th:
Klarman-Hall-Cornell-040615 - 3

Klarman-Hall-Cornell-040615 - 2 (1)

Klarman-Hall-Cornell-040615 - 1

Photos from March 10th:

Klarman_Hall-Cornell_Ithaca_031015 - 2

Klarman_Hall-Cornell_Ithaca_031015 - 3

klarman-atrium

Cornell_Klarman_Hall_Render

Cornell’s Klarman Hall Project Finishing Structural Steel

March 1, 2015 // by Jason Henderson

Welliver has been working away on Cornell’s 33,250 square-foot Klarman Hall Project throughout this winter, and in the next week or so, should be complete with all structural steel components. The construction has been split between the south and north sections in each phase since starting the enabling work in September 2013 and pursuant foundation excavation and foundation footings in July 2014. The two sections contain classrooms, offices, and the north section a 350-seat auditorium, and are joined by a large interior atrium, utilizing the rotunda of Goldwin-Smith Hall for seating, food/cafe counter service, and ingress/egress. Klarman and Goldwin-Smith will be combined through several connecting hallways and common areas as well, as shown in the plans below.

Since October, the structural steel contractor Raulli & Sons Ironworkers out of Syracuse have been delivering, craning, bolting, and welding the steel columns and beams into place, along with the massive atrium trusses that stretch the two main structural sections. As steel finished-up on the south section late November, crews moved-in to deck the floors with corrugated sheet metal and applied steel mesh to reinforce the concrete floor pours. Once the concrete dried in January, framers came in to frame the walls with steel studs and sheetrock the walls. According to the schedule (end of post), Josef Gartner comes on-site to mobilize this march to install the glass atrium. Once the large hoist crane for the steel is off-site, and the lane is cleared of equipment, East Ave will be opened-up to two-way traffic again by April 20th.

Speciality trades, framing, and drywall will take-up much activity on both the South and North Sections until June/July, and by the Fall, painting, building systems, and finish-work will be left to tackle. The project is slated for a December 2015 delivery.

 
Photos taken February 27th:

Klarman-Hall-Cornell-Welliver-02271504

Klarman-Hall-Cornell-Welliver-02271507

Klarman-Hall-Cornell-Welliver-02271520

Floor Plans:
klarman-hall-floor-plans-1

klarman-hall-floor-plans-2

klarman-atrium

 
Photos taken January 4th:
Klarman-Hall-Cornell-0104152

Klarman-Hall-Cornell-0104153

 
Photos taken December 14th:

Klarman-Hall-Cornell-1214146

Klarman-Hall-Cornell-1214145

Klarman-Hall-Cornell-1214141

 
Photos taken November 24th:

Klarman-Hall-Cornell-11241413

Klarman-Hall-Cornell-11241408

Klarman-Hall-Cornell-11241401

 
Photos taken November 3rd:

Klarman-Hall-Ithaca-11031405

 
Photos taken October 14th:
Klarman-Hall-Cornell-1014142

Klarman-Hall-Cornell-1014147
Klarman-Hall-Cornell-1014146

Cornell_Klarman_Hall_Render

2015-Klarman-Hall-Construction-Schedule-2