Ithaca Builds

Mapping, photos and information for Ithaca construction and development projects

Statler Hall Entry Renovation Project Complete

October 26, 2014 // by Jason Henderson

The Statler Hall Entry Renovation has been opened-up since late August, but the interior work and all exterior finishes are now complete. Here are some final photos for the project, which began in early summer, and took out the western-facing 1987 arched limestone entryway to replace with a new limestone and glass-wrapped 450 square foot vestibule and expanded space on the second floor above. Photos throughout construction may be seen on the project category page.

General contracting services by Northland Associates out of Syracuse, NY, and design by KSS Architects out of Princeton, NJ, and M/E Engineering out of Syracuse, NY.

Photos from September 21st:
Statler-Hall-Cornell-0921147

Statler-Hall-Cornell-0921141

Photos from October 15th:
Statler-Hall-Entry-Cornell-1014141
Statler-Hall-Entry-Cornell-1014143

Photos from October 24th:
Statler-Entry-Cornell-1024141
Statler-Entry-Cornell-1024146
Statler-Entry-Cornell-1024145

Before:
Statler_Hall_Entry_1225133

Design Render:
Statler-Hall-Entry-Renovation-Render

Statler Hall Entry Renovation Nearing Completion

September 16, 2014 // by Jason Henderson

Cornell’s $2.4 million Statler Hall Entry Renovation project seems to be nearing completion: the exterior limestone veneer facade sections are installed, and the second floor interior ductwork and mechanicals have been wrapped in insulation. Next up are final touches to the exterior- aluminum trim work between the glass curtain wall, roof fascia, stone base sill, bike racks, and the remainder of the interior finishes.

The design is by KSS Architects and M/E Engineering, and the project has been managed in-house by Cornell Facilities Services.
The renovation is intended to match the additions that have been completed on the eastern and southern sides: the Beck Center along the eastern side (Phase One Expansion), and the renovated auditorium tower on the southern side (Phase Two expansion). KSS Architects designed both the Beck Center and the Tower Renovation

Photos from September 1st:
Statler-Hall-Entry-Cornell_0901148
Statler-Hall-Entry-Cornell_0901147

Photos from September 7th:
Statler-Hall-Entry-0907145

Photos from September 15th:
Statler-Entry-Cornell-Ithaca-0916146
Statler-Entry-Cornell-Ithaca-0916143
Statler-Entry-Cornell-Ithaca-0916142

Before Photo:
Statler_Hall_Entry_1225133

Statler Hall Entry Nearing Completion

August 22, 2014 // by Jason Henderson

Cornell’s $2.4 million Statler Hall Entry Renovation is wrapping-up, as work crews finished hanging glass on the curtain wall, all exterior framing, graded and poured cement walkway, stone walls, stone base facade, and metal facade panels this past week. The new entry houses an expanded ground floor entry vestibule, additional second floor space, and significant mechanical and HVAC upgrades. The design was done by KSS Architects, whom completed the designs for the previous Beck Center and Statler Auditorium and Tower Renovations. The original limestone-clad building was completed in 1949.

Photos from August 14th:
Statler-Hall-Cornell-Ithaca-0814146

Photos from August 20th:

Statler-Hall-Cornell-2_0820142

Statler-Hall-Cornell-2_0820144

Statler-Hall-Cornell-2_0820145

Statler-Hall-Cornell_0820142

Statler-Hall-Entry-Renovation-Render

Statler Hall Entry Renovation Early August

August 11, 2014 // by Jason Henderson

Updated photos here from August 3rd and August 6th for Cornell’s Statler Hall Entry Renovation project that has been going on this summer (infill project for a new 450 square foot vestibule and also second floor space above). At this pace, I’m sure a lot more has been done since the time this is posted: the exterior wall framing looks to have been completed by the end of July, along with fiberglass sheathing around the support wall and side wall. The interior shows rapid HVAC and electric installation, and the glass curtain wall has been assembled well beyond halfway in the span of about four days. Design by KSS Architects, and project being managed in-house by Cornell Facilities Services.

August 3rd:

Statler_Hall_Entry_Reno_Cornell_0703142

August 6th:

Statler-Hall-Cornell-Ithaca-0806146

Statler-Hall-Cornell-Ithaca-0806143

Statler-Hall-Cornell-Ithaca-0806141

Statler-Hall-Entry-Renovation-Render