The post-frame CrossFit Pallas project on Cherry Street being constructed by Fingerlakes Construction looks wrapped-up on the exterior (minus parking lot and landscaping), and the interior is fully-framed out and covered with metal panels on the ceiling, and a combination of metal panels, drywall and plywood sheathing for the walls (perhaps for securing padded panels). The open-ended ducts running along the ceiling will probably be fitted with diffusers, but besides remaining drywall, fixtures and finishes, the building itself looks rather complete.
CrossFit Pallas July Photo Update
August 3, 2014 // by Jason Henderson