Longest Night Solstice Towers Utility & Roof Work Photos

April 13, 2014 // by Jason Henderson

Solstice-Towers_Ithaca_031514

Tower one has made progress on interior electric rough-in, sanitary plumbing rough-in (water supply lines will follow-up shortly), and insulation, while tower two is finishing-up interior framing. On the exterior, new lateral utility services have been installed on the eastern 5′ setback, including buried sprinkler and domestic ductile water lines, a 1/8″ to 1/4″ pitched PVC sanitary sewage lateral (green), 1 1/2″ diameter electric conduit for power, 3/4″ diameter pipe for data and telephone (grey lines wrapping around wall footer), a gas line, and new NYSEG electric meters mounted on both tower side walls. The service trench was backfilled with crushed #2 gravel, layered between blankets of soil.

 

Solstice-Towers-0320141

Plumbing by Warden Plumbing, excavation and backfill by Kirksway Farm, and electric by Shisler Electrical Contractors.

Solstice-Towers-Ithaca-0404141

Hale Roofing Inc has completed the roofing installation by applying a Thermoplastic Polyolefin (TPO) single-ply roofing membrane over gypsum fiber roof board underlayment:

Solstice-Towers-Ithaca-032114

Typical cross-section (with steel decking):
tpo_cutaway

The black aluminum gutter and downspout will collect roof water runoff out of the open slot in the parapet wall, which then funnels underneath the drive lane through a drain pipe, then to irrigation drip lines along fencing to provide water to plantings along the fence:

Solstice-Towers-Ithaca1

Solstice_Towers_Ithaca-04081406

Project by Architect John Barradas and Partners, construction by Ciappa & Marinelli Builders