The CrossFit Pallas project is moving right along: additional sections of exterior metal siding have been installed, along with the windows, electrical rough-ins, insulation batts in the wall and ceiling cavities, interior vapor barrier, and corrugated sheet metal ceiling.
The project is being constructed by Fingerlakes Construction Co. (Clyde, NY, founded in 1969), which specializes in post frame construction (also referred to as pole building framing), and was acquired by Energy Panel Structures, Inc. last year.