The roof fascia has mostly made its way around, and there’s some new material covering-over the steel framing section on the roof; it may be screening for mechanical equipment, possibly makeup air units. There have been bricks removed on either side of each window header along the Seneca Street side, but I’m not sure why. The render (below) shows the architectural shades about 2/3rd of the way up, but perhaps they’ll be installed at the top of each window.
Beckenridge Place Updated Photos
December 11, 2013 // by Jason Henderson