The Planned Parenthood site looks about the same as last week, with nearly all of the major structural work complete. The steel post columns on the exterior edges are all in place, so we should probably see a big delivery of metal studded wall panels to form the exterior walls, but the floor decks would be poured with concrete first (although it’s hard to get a good view of anything above the ground level).