Ithaca Builds

Mapping, photos and information for Ithaca construction and development projects

Klarman Hall Site Prep-Work Updated Photos

September 19, 2013 // by Jason Henderson

The future Klarman Hall’s eastern side along East Ave. has some preliminary excavation work with a small excavator and a dump truck. We’ll probably see a relatively level surface work its way down as the excavator chips away at this steep grade so that it can stay stable. Lots of soil to move though- all the more reason a concrete retaining wall will be going in this February.

Klarman_Hall_9183