I don’t see much change on the building from the outside, so I imagine the interior is seeing most of the action this past week, however, the curbing and a few feet of road asphalt on both the Cayuga Street and Seneca Street sides has been demolished and dug-out, probably in preparation for the new sidewalks, curbs, storm drains, and landscaping.