Here are some current images of the western Statler Hall entrance that Cornell is planning to renovate into a redesigned vestibule and facade, expanded second story above, and landscaping in front. Something I hadn’t noticed before- the proposed stone base wall sections will match the existing ones below each ground floor window along East Avenue, and the sections along College Avenue that were completed as part of the Tower and Beck Center Renovations. The proposed facade will also match the original limestone block from the 1949 build, which the current entry does quite well too.
Revised Planting Plan: