Lofts@SixMileCreek Construction Photos

April 1, 2015 // by Jason Henderson

Steve Bloomfield of Bloomfield/Schon + Partners was kind enough to grant a tour of his Lofts@SixMileCreek project downtown, so here are some photos taken about two weeks ago, and the press release from yesterday. The construction schedule has been revised for late summer completion, but a tour will be available April 18th through the Downtown Ithaca Alliance. Most walls have been framed, and trades are currently roughing-in services at the top floors, and drywall and finish-work has begun at the lower floors. The exterior wall framing and glazing has progressed to the fifth floor, so the building should be almost fully-enclosed in the coming weeks.

The project is a 7-story, 49,244 square foot structure that will contain 45 rental apartment units. The building is being developed by Bloomfield/Schon + Partners, with construction by Turnbull-Wahlert Construction.

Unit floor layouts link here

Lofts@SixMileCreek_Ithaca_031415 - 1

Press Release March 31 2015 Final - Online Leasing

Photos taken March 14th, 2015:

Lofts@SixMileCreek_Ithaca_031415 - 2

Lofts@SixMileCreek_Ithaca_031415 - 14

Lofts@SixMileCreek_Ithaca_031415 - 22

Lofts@SixMileCreek_Ithaca_031415 - 15

Lofts@SixMileCreek_Ithaca_031415 - 9

Lofts@SixMileCreek November to February

February 26, 2015 // by Jason Henderson

November to February photo updates here for the downtown Ithaca Lofts@SixMileCreek project, building a 7-story, 49,244 square foot structure that will contain 45 rental apartment units. The building is being developed by Bloomfield/Schon + Partners, with construction by Turnbull-Wahlert Construction.

The structure was furred-out with lumber on the edges and wrapped in plastic in November to prepare for the arctic winter we’ve been experiencing here in Ithaca, and work has since sped-away to finished wall-framing, rough plumbing, electric, HVAC, exterior sheathing, exterior wall systems (windows and conventional metal framing) and interior wallboard. The phasing for each trade has progressed from the first floor and up, so it’s likely that the lower stories are in the midst of finish-work. The shower stalls made their way in during the early wall-framing phase in October (most units secure directly to studs nowadays).

The structure topped-out on October 2nd with a press event and completion is scheduled for Spring 2015, probably May.

Project Website has launched: http://ithacalofts.com/

Photos from February 24th, 2014:
Lofts@SixMileCreek-Ithaca-0224152

Lofts@SixMileCreek-Ithaca-0224154

 
Photos from November 24th, 2014:
Lofts@SixMileCreek-Ithaca-11241419
Lofts@SixMileCreek-Ithaca-11241410

 
Photos from November 3rd, 2014:
Lofts@SixMileCreek-Ithaca-11031412
Lofts@SixMileCreek-Ithaca-11031411

Lofts@SixMileCreek October Photo Update

October 28, 2014 // by Jason Henderson

Photo updates here for the downtown Ithaca Lofts@SixMileCreek project, building a 7-story, 49,244 square foot structure that will contain 45 rental apartment units. The building is being developed by Bloomfield/Schon + Partners, with construction by Turnbull-Wahlert Construction.

The sprinkler pipe-fitters have made their way from the ground floor to 5th, and interior metal stud walls were roughed-in on the ground through the third floor with bottom plate layouts installed on the fourth as of late last week. Shower stalls have made their way into more than a dozen bathrooms, as plumbing risers and pipes are fitted alongside wall completions. A paint contractor has been spraying down the structural steel with fire retardant intumescent paint (the white coating). The structure topped-out on October 2nd with a press event and completion is scheduled for early 2015.

Photos from October 17th:
LoftsatSixMileCreek-10-17-1416

LoftsatSixMileCreek-10-17-1412

Photos from October 24th:
Lofts@SixMileCreek-10241412

Lofts@SixMileCreek-10241410
Lofts@SixMileCreek-10241405
Lofts@SixMileCreek-10241402

Lofts@SixMileCreek Structure Complete & Photo Update

October 7, 2014 // by Jason Henderson

Cayuga Place Residences Units

The Lofts@SixMileCreek project topped-off last Thursday by holding a ceremony with the Mayor, City Officials, the press, and the public. The 7-story, 49,244 square foot project is aiming for completion in early 2015, and will contain 45 rental apartment units.

The structural erection was done by Rochester Rigging and Erectors, and utilized the Girder-Slab® precast concrete plank flooring system, which sets on top of D-Beam® girders, is grouted at the seams, and allows for quicker installation, and 8-10″ floor depths, which helps maximize floor-to-ceiling heights, and minimize the height of the building. The 7-story structure is considered a high-rise by building codes, thus the heavy-gauge construction.

LoftsatSixMileCreek-Ithaca-102142

LoftsatSixMileCreek-Ithaca-10051404

LoftsatSixMileCreek-Ithaca-102141

HALCO Plumbing and Heating has begun running risers up from the ground floor:

LoftsatSixMileCreek-Ithaca-10051416

ithacalofts

Lofts@SixMileCreek Tops Out Thursday

September 26, 2014 // by Jason Henderson

Lofts@SixMileCreek, the name for the Cayuga Place/Cayuga Green 2 project is now official, and the top-out ceremony is this coming Thursday, October 2nd at noon (12:00). Topping-out (or “topping off”) is when a building’s structural assembly is complete, generally when the highest point of the structure is finished.

The 7-story, 45-unit, 49,244 GSF project from Bloomfield/Schon + Partners out of Cincinnati, Ohio has been moving right along, as the final columns and beams of the structure are craned-in and secured, and concrete plank floors are installed this week and next. The ground floor has been levelled and plastic sheeting and steel mesh has been put down to prepare for a concrete pour for the slab floor. The core assembly began back in July, with the steel assembly following-up in early August. The project is being constructed by Turnbull-Wahlert Construction.

Here’s the Press Release announcement:
Presenting the Topping Out Ceremony of Downtown Ithaca’s newest residential construction Lofts@SixMileCreek on October 2, 2014 at 12pm.
Celebrate a traditional “Topping Out” as developer Bloomfield/Schon + Partners and Turnbull-Wahlert Construction hoist the final beams to the top of these contemporary and luxurious loft-style living apartments Lofts@SixMileCreek. Currently under construction, Lofts@SixMileCreek is located at 217 South Cayuga Street, downtown Ithaca, NY. Completion is scheduled for early 2015.

On October 2, 2014 at 12pm, Cincinnati developer Steve Bloomfield and Ken Schon, the crew of Turnbull-Wahlert Construction, Mayor Svante Myrick, alongside community business members, will address the high demand for loft- style apartments in downtown Ithaca. The ceremony is a construction tradition topping out the highest point of construction. Lofts@SixMileCreek is a 45-unit, sophisticated loft-style living masterpiece. Located at 217 South Cayuga Street, downtown Ithaca, just off of the Six Mile Creek Walk. The Lofts@SixMileCreek is the second building of Cayuga Place that includes apartments, retail and office space.
Lofts@SixMileCreek will be comprised of upscale studio, one and two bedroom loft apartments with high-end finishes such as stone countertops and upgraded appliances. Built under green construction methods, these energy efficient, elegant apartments will have spectacular views along Six Mile Creek. Balconies and terraces will be available on most units. Park your car in the Cayuga Street parking garage and enjoy direct access to the new building. Leasing information should be available by November 2014. Refreshments will be served.

Contact info@ithacalofts.com or follow us on Twitter @Lofts6MileCreek. Check back to our website www.IthacaLofts.com in November when we will present leasing information, unit availability, interior photos, amenities, floor plans, building layouts and exciting new perks of living in Lofts@SixMileCreek.
Project financing through First Niagara.

Full PRESS RELEASE HERE

Photos from September 24th:
Cayuga-Lofts-At-Cayuga-09241401

Cayuga-Lofts-At-Cayuga-09241410

Cayuga-Lofts-At-Cayuga-09241414

Photos from September 21st:
Cayuga-Place-Residences-09211420

Cayuga-Place-Residences-09211417

Cayuga-Place-Residences-09211406

ithacalofts

Coltivare Complete Interior Photos

April 8, 2015 // by Jason Henderson

I had a chance to swing by the Coltivare Culinary Center and Restaurant downtown a few weeks ago, so here are some interior shots of the finished product, opened-up in December of last year. TC3 announced the project as part of its Farm-to-Bistro education program in late 2013/early 2014, and plumbing and framing work began on the space in May, 2014.

The interior spans 17,000 square feet with a bar, public restaurant, full kitchen, cooking lab, teaching lab, a lounge with offices and restrooms, and two large assembly areas for events split by a vertically-collapsible folding wall. The interior finishes are varied: brick veneer, tile, composite/rubber, and painted walls; tile, wood, and carpeted flooring; and interesting finishes, like the reclaimed wood-trimmed and tin-panelled ceiling clouds, and filament bulbs. It’s quite a cool space.

The interior design was done by Ramsgard Architectural Design, with construction by Turnbull-Wahlert Construction out of Cincinnati, Ohio, the same firm that is building the Lofts@SixMileCreek project for Bloomfield/Schon + Partners behind the building.

TC3-Coltivare-Ithaca-022415-232

TC3-Coltivare-Ithaca-022415-231

TC3-Coltivare-Ithaca-022415-217

TC3-Coltivare-Ithaca-022415-215

TC3-Coltivare-Ithaca-022415-226

TC3-Coltivare-Ithaca-022415-224

TC3-Coltivare-Ithaca-022415-220

TC3-Coltivare-Ithaca-022415-214

TC3-Coltivare-Ithaca-022415-210

TC3-Coltivare-Ithaca-022415-207

TC3-Coltivare-Ithaca-022415-202

TC3-Coltivare-Ithaca-022415-212

TC3-Coltivare-Ithaca-022415-222