Cornell’s future 33,250 square foot Klarman Hall Project being constructed by Welliver has continued progress on the concrete wall along East Avenue and the south foundation walls. The shoring wall along East Ave (driven into place over the summer) holds the soil back as rebar is assembled, then large steel forms are craned in place and secured, and concrete is poured section-by-section going south to north. It’s hard to make out the status of the north foundation walls, but looking at the schedule, we should see rebar assembly there shortly. The south foundation walls have been completed, and steel erection above these walls should begin soon. Photos from August 20th and September 1st below:

Photos taken August 20th:

Klarman-Hall-Cornell-0821141
Const-Schedule-thru-Sept-2014
Klarman-Hall-Cornell_08201403

Klarman-Hall-Cornell_08201404

Photos taken September 1st:

Klarman-Hall-Cornell_0901147

Klarman-Hall-Cornell_0901144

Klarman-Hall-Cornell_0901142

Klarman-Hall---Presentation---04-24-13

Design by Koetter | Kim & Associates