Ithaca Builds

Mapping, photos and information for Ithaca construction and development projects

TC3’s Coltivare Space Plumbing and Framing Work

May 21, 2014 // by Jason Henderson

TC3_Coltivare_Ithaca_0519144

Tompkins Cortland Community College‘s 17,000 square foot Coltivare space inside the ground floor of the Cayuga Street Garage has been moving along with a ton of below-slab plumbing work, and metal stud wall framing. Cuts made into the concrete floor slab have been jackhammered out, dug, and pipes laid by HALCO Plumbing & Heating for a slew of drains that will serve bar, prep, kitchen, classroom, and restroom sinks and toilets.

Due to the downward sloping ceiling deck in the back half of the space from south to north, the floor layout utilizes the lower-clearance space for storage, then restrooms, then classroom space towards the southeast. The southwest to center-west portion will comprise the public restaurant, along with ample outside seating along the corner and following East Clinton Street. The plan is to be ready and open this August, in time for the Fall semester. The design for the space is by Ramsgard Architectural Design, with general contracting services by Turnbull-Wahlert. Along with Coltivare, this corner of Ithaca will be seeing quite a transformation with the addition of the 39-apartment unit Cayuga Place Residences over the course of the next year.

There’s a new online video from TC3 explaining the Farm to Bistro program, containing interviews from locals in the food and wine industry:

 

TC3_Coltivare_Ithaca_0519147

TC3_Coltivare_Ithaca_0519141

Coltivare-Modified-SPR-Application-Form-and-Drawings---02-18-14-3