Carey Building VI: Ceiling Demo Done, ACM Removal

February 28, 2014 // by Jason Henderson

The plaster ceiling demolition has been completed by Compass Builders, and asbestos-containing material (ACM) remediation began earlier this week, so the space is completely closed-off. There’s about 366 linear feet of pipe-wrap and sections of old 9×9 floor tile being removed on the second floor by Sunstream Corp, out of Binghamton, NY. The supply loop for the radiators runs up from the basement, then around the perimeter of the second floor roughly 12-13 feet off the floor, above where the plaster ceiling hung. The pipe was insulated wherever it was not exposed to finished space, so basically above the ceiling, and within exterior wall chases.

Carey_Building_02251405

 

The ACM assessment survey was done by Microbac Laboratories out of Cortland, NY, and they stay on-site during the remediation phase to monitor air quality. Here’s the second floor map, indicating materials found in the survey:

Microbac-Carey-2nd-Map

 

John Snyder Architects is currently working on the details for the final incubator design in collaboration with the team from Cornell University. Here’s the demolition plan, showing all the walls that have been removed from the second floor:

 

Carey_2ndfloordemo

Carey_Building_02251409