Throughout past week, Compass Builders have made quick work of the old plaster ceiling demolition, and now that the ceiling is exposed, Sunstream Corp will be commencing remediation on the pipe wrap material starting mid-week. The current piping above the former plaster ceiling provides the supply loop for the radiators, which are returned via separate runs to each unit from below. We found an old heating system drawing from the 1926 installation- the second floor sketch is below.
Once the ceiling was exposed, it confirmed the design intent for the finished space, which would be to leave the concrete ceiling slab, beam and column work exposed in the finished space. One of the more popular renovation (especially office & residential space) trends is to leave old structural elements exposed- the leasing term thrown around is called “brick and beam” space, which implies leaving brick walls, and typically, reinforced concrete columns, beams, and floor slabs exposed. In addition to adding a characteristic style, there are some practical advantages as well: electrical conduit runs and HVAC (heating, ventilation, and air conditioning) ductwork are visible, providing a transparent view of where services lead, and eliminating the additional time, materials, and complexity of working around finished walls or drop ceilings. There’s about 14 feet of headspace on this level, so the high ceilings provide another desirable advantage.

Carey_Building_Ithaca_02211415

Carey_Building_Ithaca_02211408

Carey_Building_Ithaca_02211413

313-3-Carey-Bldg